BREB Online Connection System, For the application, 115 TK has to be paid. Applications for rural electricity new meters are to be made from the BREB online connection system.
At the time of application, the candidate has to upload some documents including a photograph, NID card, and land certificate.
After doing these, the candidate’s application is scrutinized by BREB within a few days and if everything is fine, the new meter connection is given within a few days.
About BREB Online Connection System
Newly settled residents have to apply for a new meter for electricity connection to their homes. As everything is online-based these days, applications for electrical connections can be made online.
Applying for a meter by going to the electrical office is very time-consuming and expensive, as well as quite a hassle. To avoid all these problems, you can apply for a new electric meter online at home.
Candidates have to submit several documents before applying. After collecting all these documents candidates have to apply online.
The detailed process of how to apply online is mentioned below step by step. Hope you can apply for a new BREB Online Connection System very easily by looking at this process.
Palli Bidyut Meter Application
There are different types of electrical connections. Among them, the BREB electricity meter application is the largest by an organization called BREB.
Through this organization, electricity connection is provided to all the palli areas of Bangladesh.
For the BREB Online Connection System, in the earlier era, we had to go to the electricity office and stand for hours, days, and months.
But nowadays everything is online based, we can do BREBl electricity meter application sitting at home.
It is unbelievable but true. In today’s discussion, we have shown how to apply for an electric meter online at home.
BREB Online Application Requirements
For BREB Online Connection System or rural electricity new meter application, we need to know what things are required for the application. Documents required to apply for a new meter are-
- Applicant’s name and mobile number
- Applicant’s National Identity Card Number and Permanent Address
- Address of connection point
- Land ownership information, plot number, and Khaitan number of the place where the meter will be connected
- The account number of the neighboring customer under the transformer from which the connection will be made
- Distance of house from nearest service pole (in feet)
- The number of loads used in the house – lights, fans, TV, fridge, sockets, etc. will be used
- The customer’s photograph, national identity card, and certificate of the owner of the land if he is not the owner of the land himself
- Cash memo photo of the ground rod to ensure house warring
Collect all these documents before applying, then follow the application process given below.
BREB Online Application Step-by-Step Process
Now let’s go to the main discussion. In this phase, we will know how to do the BREB online application. Follow the below steps carefully to apply for a Palli Bidyut meter online.
- For BREB online application or rural electricity meter new application open any browser from a mobile or computer and visit BREB online Connection System.
- After visiting this website you will see a dashboard.
- From here tap on the ‘Application’ option from the above menu.
- Then from here click on the ‘Apply’ For New Meter button. After clicking on that menu, an application form will appear to apply.
Details of Electricity Office
The first section of this form contains the electricity office details.
- Here in the first box is the ‘Samiti Name’
- You have to select the name of the Samiti name from which you want to get your connection here.
- If you don’t know about this Samiti Name, then find out from any electricity consumer in your neighborhood from which Samiti they have taken their connection.
- Then there is the ‘Zonal Office’.
- In this option also you have to enter the name of the Zonal Office. If you don’t know this then find out this also from any electricity customer near you.
Connection
- Then move to the ‘Connection section’. There is an option called connection tariff.
- Tap here to get several options.
- If you want to get an electricity connection at your home then you must select ‘LTA Abasik’ as the connection tariff here.
- And if you want to take other fields then you have to select the option according to the field.
Applicant details
In the applicant details section, you need to provide a lot of information.
- Here the first section is the Name of the Applicant in Bengali.
- The applicant’s name must be written here in Bengali.
- Then according to the NID card, the applicant’s father’s name, mother’s name, and husband/wife’s name should be written in Bengali.
- Then the date of birth should be written in English.
- National identity card number, mobile number, email, nationality, and gender must be provided.
- Here all the options with red (*) stars must be filled.
- And there is no problem if you don’t fill those that don’t have a red star mark. But it is better to fill it.
Permanent address and proposed electricity connection
- In the permanent address section, you have to fill in all the details of the ‘Permanent Address’
- District, Upazila, Union, Post Office, Post Code, Village/Mahalla, Road Number, House Number, Holding Number all the information should be filled in very well.
- Then below you will find the recommended ‘Power Connection’ details section.
- This means that you have to fill in the details of the place where you want to get your electricity connection.
- If you want to connect your meter to a permanent address then there is an option below the permanent address that is ‘Use as address at the proposed electricity connection’ There is an option to put a tick mark.
- A tick mark must be provided here if you want to connect the meter to your permanent address.
Geographic information
You have to be careful in the geographical information section because all this information needs to be known from the electricity customer near you.
- The first option here is the distance from the nearest service pole, the distance of your house from the electric poles around your house in feet.
- Then there is the option ‘Nearby customer’s book number under the same transformer’
- To fill this option, you have to write the book number of any electricity customer in your neighborhood and write his meter number in the box below.
- On the right side, there is the account number and phone number, these two pieces of information should also be known from your nearest electricity customer.
Connection details, Load, And Demanded Load
The connection details have an option called Application Type. There are three options here.
- If you want to take your connection permanently then you must select Permanent Connection on the ‘Connection Type’
- Then fill up all the required information correctly.
- Once the above information is filled in, move to the load section.
- Here you need to connect TV, lights, fans, refrigerators, and other electronic devices including how many will be run and how much they will load, total load, etc. information one by one.
- When you select TV, fridge, or lights, then the total load will be added automatically.
- There are three options in the Demanded Load section. They are total load, phase, and voltage.
- When you add your items the total load will be added automatically but you will need to select phase and voltage.
- If you use electricity normally then select single phase and 230 volts is best for the home as the voltage. Select 230 volts here.
Location of home or establishment and comments
In this section, if there is anything to write in the location and comments of your home or organization, then write it and if there is nothing to write, then there is no problem.
Document upload
Once everything is filled you should come to the Upload Documents section.
- Here you have to scan your photo, national identity card, and other documents on your device and upload them here.
- Their maximum size and maximum kilobytes are written on the right side. You should upload them keeping them in mind.
- After doing this you will get a text below that says ‘I agree to the below-mentioned terms of service of Palli Bidyut Samiti’ Put a checkmark on the box on the left side.
- After that, you will get a ‘Captcha’ code in the answer box and click on the save button.
- Once this is done your online application will be completed initially.
Once the application is done, take a printout of the application form as a tracking number, and a PIN will be given in this application form. You will need it later.
So print the application form. If it cannot be printed then download it for now and later you can go somewhere else to print it.
Confirmation House Wiring For Palli Bidyut Meter Application
House wiring must be confirmed while applying for a BREB online connection or a rural electricity meter.
You have to upload a house wiring memo as proof that you have done house wiring in your house before they will connect electricity to your house.
So you have to upload the purchase memo in this application section for all the things you buy for house wiring. Follow the steps below to upload to the application section.
- First of all, go to the BREB Online Connection System website and click on the ‘Confirm House Wiring’ button from the application option.
- By clicking here you will get an option to provide the tracking number and PIN to confirm house waring.
- Here you have to enter the tracking number and PIN in your application form and click on the submit button.
Then your house wiring will be confirmed.
BREB Online Connection Application Fee
Application for BREB online connection or rural electricity meter new application has to be provided. The general application fee is TK 115.
Application fee for BREB Online Connection System must be paid for successful completion of the application. Follow the procedure below to know how to pay the application fee.
REBPBS Online Application Fee Payment Guide
Application fees for BREB Online Application or Palli Bidyut Meter Application can be paid in two ways.
One is by going directly to the electricity office and the other is online. If you pay directly at the electricity office, you will have less trouble. But it can also be paid online.
However, for this, you will need a Rocket account. If you have a Rocket account and you want to pay the BREB online application fee through the Rocket account then follow the below procedure.
Once the fee payment is done your application will be completed.
How Long Does It Take To Get a New REB Meter?
Generally, the connection is provided within three months after making a new application for the Palli Bidyut meter.
The application will be accepted by the office after applying online. The BREB office will then visit your meter application site and verify everything.
If everything goes well, BREB will connect your new electricity meter within 3 months. However, it may take longer in some cases. That’s why you have to wait patiently.
You Can Also Read – NESCO New Meter Application Online If you want to apply for a new NESCO Meter.
REBPBS Online Contact Number
If you face any problem with BREB Online Connection, Palli Bidyut Meter application, or any other problem with Palli Bidyut, then contact them by following the contact address below.
Bangladesh Rural Electrification Board
- Address: Head Office, Nikunja-2, Khilkhet, Dhaka-1229
- Telephone: 88-02-8916424-28, 8900331, 8900335
- Fax: 88-02-8900611
- Website: www.reb.gov.bd
FAQs About BREB Online Connection System
Many people have many questions regarding the BREB Online Application or Palli Bidyut New Meter application. We have collected all those questions and tried to answer them in this section.
Is there any way to get a Palli Bidyut meter within 1 month?
Ans: We know that we have to wait at least 3 months to get a new rural electricity meter.
It is possible to get a rural electricity meter connection within three months. But if someone needs a very urgent meter connection then in that case must contact the BREB office.
What to do if the meter is late?
Ans: What to do if the meter is delayed? Many pass three months, six months, or even a year after applying but still, the meter connection does not come.
There are some reasons for this. That is, if there is any mistake in your application or if a long time has passed after making the application, you must contact the Palli Bidyut Samiti office.
Final Words
In today’s discussion, We have tried to highlight everything that is required for a Palli Bidyut meter or BREB Online Connection System.
Hope if you follow these procedures today you will be able to apply online for Palli Bidyut New Meter very easily.
If there is any problem with BREB Online Connection System then you can comment it to us. We will try to help you with information.